Emil Frey AG Nutzfahrzeug- und Fahrzeugbaucenter · Switzerland ASTRA original line Safenwil second stage revision
- Objects
- 3LB101 Lane Emil Frey AG is responsible for the second phase of Safenwil, noting FACT test report TA-25-N015-00
- The Market
- Switzerland
- The power
- BEV
- The state of the incident
- Local modification approval
- Date of the incident
- 2025-08-25
- Date of evidence
- Unknown
- Source level
- Control of the hand.
The local two-step repair route can be confirmed and approved. the first repair date, actual number of vehicles, parts and packages of vehicles still need to be repair record or additional markings
Swiss Federal Road Administration ASTRA · chRemarks' 04 and 12 columns, stage 1 base car and stage 2 repair enterprise location and test report number