Geely EX5 EM-i · Brazil manufacturers reveal the first ships to be dropped in the port of Baranagua
- Objects
- In March 2026, the first package of mixed products was removed from Parangua and the same package of publications referred to another package of pure electricity EX2
- The Market
- Brazil
- The power
- PHEV
- The state of the incident
- The first ship.
- Date of the incident
- 2026-03
- Date of evidence
- 2026-03-30
- Source level
- Manufacturers in hand.
The original document does not confirm the number of the package, specific ship loss dates and delivery by the car client; EX2 is a separate vehicle model
Guilherme Brazil · The first set to Port title and the independent set section EX2 released on March 30