EXEED ET BEV · announces local pure electric configuration
- Objects
- 7 kWh battery
- The Market
- The UAE
- The power
- BEV
- The state of the incident
- Official Show
- Date of the incident
- Not later than 2026-11-23
- Date of evidence
- Unknown
- Source level
- Local authorized channels.
Capacity according to the specification tables; annual amount, supply sources and vehicle package are expected
EXEED UAE · Model page linked ET specification table Page 2 BEV line Battery line