Leapmotor B10 DESIGN · Local assembly has been carried out
- Objects
- Malaysia Gigi to Gurun Factory
- The Market
- of Malaysia
- The power
- BEV
- The state of the incident
- has been performed
- Date of the incident
- Not later than 2026-09-07
- Date of evidence
- 2026-09-07
- Source level
- Manufacturers in hand.
Malaysia announces the DESIGN version 67.1 kWh battery; production and configuration range of application are not promoted to Spain or add-on models
Stellantis Malaysia · announced first and local B10 single DESIGN section